Risk Register Module
Risk Register Module
Overview
The Risk Register is the central repository for documenting, assessing, and monitoring all organizational risks. It provides a structured approach to risk identification and assessment.
Key Features
- Centralized risk documentation
- Risk categorization and tagging
- Likelihood and impact assessment
- Inherent and residual risk scoring
- Risk cause and impact analysis
- Control association
- Treatment planning
- Review scheduling
- AI-powered risk generation
Creating a Risk
To create a new risk entry:
- Navigate to Risk - Risk Register
- Click Add Risk
- Fill in risk details:
- Risk ID - Unique identifier (auto or manual)
- Name - Risk title
- Category - Risk category
- Description - Detailed risk description
- Scenario - Risk scenario explanation
- Owner - Person responsible for the risk
- Click Submit
Risk Assessment
Assess each risk using:
- Likelihood - Probability of risk occurring (1-5 scale)
- Impact - Severity if risk occurs (1-5 scale)
- Inherent Risk - Risk level before controls (Likelihood x Impact)
- Residual Risk - Risk level after controls applied
Risk Analysis Tab
The Analysis tab allows you to:
- Set inherent risk levels
- Define risk exposure
- Calculate residual risk after controls
- View risk matrix positioning
Risk Causes and Impacts
Document risk causes:
- Open the risk detail
- Navigate to Analysis tab
- Add causes that could trigger the risk
- Add potential impacts if risk materializes
Linking Controls
Associate controls with risks:
- Go to Control tab in risk detail
- Click Add Control
- Select existing internal control or create new
- Define control effectiveness
Risk Review
Set up periodic reviews:
- Configure review schedule (frequency)
- Add review records
- Document review findings
- Update risk status as needed
AI Risk Generation
Use AI to generate risks:
- Click Generate with AI
- Provide context or select category
- Review AI-suggested risks
- Import relevant risks to register
Generating Risk Reports
Create individual risk reports:
- Open the risk
- Click Generate
- Download PDF report with full details